I'm asking for people's experience though to guide me in what I should prep. What would need to be looked at? JJ
so the plan based on the fact that clearly my first thinking is way off. new CU with 2 extra spaces old 6mm cable on 32A MCB to feed induction (on rcd side) and isolated through cooker switch new 6mm cable on 32A MCB to feed 2 x cookers (on rcd side) and isolated through cooker switch JJ