I am installing a ramp profile bar between oak floor and carpet. The oak floor is laid but the carpet is not yet down. Do I fix the channel before the carpet is fitted and have the carpet gripper/and carpet fitted up to the channel and then sit the profile into the channel after the carpet has been laid. Or do I fit the channel on top of the gripper/carpet?