r2d2 yes the boiler is switched to on 24hrs a day the ch is then controlled by a seperate timeclock so when the ufh is off at night from 8pm to 6am the boiler still needs to be on incase the setback stat needs to operate the set back stat justs runs the pump on the ufh - it relies on the boiler being on water sys what about the 2 cu mtr to heat the water (150 l) it seems excessive?
He did water systems. 2m³ in 50mins If a Powermax took 50 mins to raise 150 litres 60C, it is way too slow. There is something wrong with the boiler settings. Is the meter regulator at fault? Only allowing a reduced volume of gas. The boiler settings and the gas meter and its regulator needs looking at.
He did water systems. 2m³ in 50mins If a Powermax took 50 mins to raise 150 litres 60C, it is way too slow. There is something wrong with the boiler settings. Is the meter regulator at fault? Only allowing a reduced volume of gas. The boiler settings and the gas meter and its regulator needs looking at. Some calcs: To raise 150 litres water 50C over 50 mins = 17.50 kW That is output. Assume 85% effciency of boiler then the input is: 20.59 kW <u>Bang on!!!!!</u> 21 kW <u>The boiler is OK.</u>
He did water systems. 2m³ in 50mins If a Powermax took 50 mins to raise 150 litres 60C, it is way too slow. There is something wrong with the boiler settings. Is the meter regulator at fault? Only allowing a reduced volume of gas. The boiler settings and the gas meter and its regulator needs looking at. Some calcs: To raise 150 litres water 50C over 50 mins = 17.50 kW That is output. Assume 85% effciency of boiler then the input is: 20.59 kW <u>Bang on!!!!!</u> 21 kW <u>The boiler is OK.</u> There again if the boiler is capable of more output than 21kW, the modulation may have brought back the boiler output as the temp diff of the flow and return closed. This still doesn't sound too right as 50 mins to recover the DHW is way too long, as the CH will be starved during this time as it is a priority system. Mmmm, still needs checking, both boiler and meter regulator.
To raise 150 litres water 50C over 50 mins = 17.50 kW 150 x 4.18 x 50 = 31350 kj. divided by 3000 seconds =10.45 kw. Then add on boiler and heat exchanger inefficiencys.
To raise 150 litres water 50C over 50 mins = 17.50 kW 150 x 4.18 x 50 = 31350 kj. divided by 3000 seconds =10.45 kw. Then add on boiler and heat exchanger inefficiencys. You are right. I put 250m litres not 150 litres. Simpler using (temp rise x litres x specific heat)/ seconds in an hour (50 x 150 x 4.2)/3600
To raise 150 litres water 50C over 50 mins = 17.50 kW 150 x 4.18 x 50 = 31350 kj. divided by 3000 seconds =10.45 kw. Then add on boiler and heat exchanger inefficiencys. So how come it took 21 Kw
So how come it took 21 Kw Ineficiencys through the heat exchangers ? unit charge (pence per kWh) 1.63 . So it cost about 34 pence to heat this volume of water.
sorry i didnt look at the burner all the time during the 1 hour test - except for the last 10 mins the burner wasnt on then so it could have done it in 25-30mins my gas is 3.35p per kwh from powergen im out all day today so will be in touch tonight - if any answers needed ta
so on 20 cu per day equals 220.6 kwh per day x 3.35 pence = 7.39 per day x 31 days per month = £229.09 per month say on for 7 months ufh = £1603.63 then just water heat for 5 months say so its £2k per year - **** me !!!! any one want to buy a house ?
like i said im a roofer not a plumber - im not sure of heat times if you have a roof question i would be happy to help and wouldnt expect you to be fully knowledgable if you werent a roofer thanks
sorry i didnt look at the burner all the time during the 1 hour test - except for the last 10 mins the burner wasnt on then Time heating the cylidner from cold. Approx temp of cylidner at statr and finsih and how much gas used. That will give a good insication of the boioer and meter accuracy. If they are fine you have serious problems in insulation on the CH side. Or, you have a very big house.
The 50mins to raise the temperature through 60c and the 2m³ (21Kw) of gas is actual give or take a few degs C Water Systems. Water Systems; In hot water priority, does the boiler remain on high flame untill the store is satisfied or does it modulate down and trickle charge say the last 10-20c.<u></u>
1.63p per Kw where do you get your gas from, my last bill was 4.42 I may have been mistaken here. It was pheonix gas pdf link which I think was a couple of years old. so its £2k per year - **** me !!!! Sounds fine to me. My heating bill for oil is around £1000 yearly in a property half the size of yours and as I have said I know people paying a lot more than you are paying heating propertys fitted with UF heating. In hot water priority, does the boiler remain on high flame untill the store is satisfied or does it modulate down and trickle charge say the last 10-20c. It will depend on the size of the coil inside the cylinder. On initial start up the burner should modulate up full but as the cylinder heats up the coil may not be able to dissipate the heat that the boiler is producing so it will either modulate back the burner or switch off with the pump remaining running. In my view that is .