Hi quick question when putting a new soil pipe into an existing inspection chamber , can you put it in at the same height as one that is already there say half way up or do you have to take it down to the bottom.
Normally, conection is made at invert level, via a slipper into existing channel. Sounds like you already have a tumbler, ie pipe half way up chamber. Best to run it by bco first.