Self build single storey footings help

Discussion in 'Builders' Talk' started by Kaned93, Jun 22, 2017.

  1. Kaned93

    Kaned93 Member

    ok that's great do you lintel to cover the 600mm width so no concrete gets to the drain that you pour between first courses?
    sorry if it's a stupid question
     
  2. Phil the Paver

    Phil the Paver Screwfix Select

    No.
    Shutter up to the level of the concrete.

    When concrete set remove shuttering and fill void with 10mm PEA gravel.

    When setting brick work lay the lintels then, leaving the cavity open.
     
    Last edited: Jun 23, 2017
  3. Kaned93

    Kaned93 Member

    ok that's great. really appreciate the help do you leave the cavity open up to doc?
     
  4. Phil the Paver

    Phil the Paver Screwfix Select

    5308328_orig.jpg



    Don't worry too much about the measurements, it just an out line pic of what your looking for.
     
  5. Phil the Paver

    Phil the Paver Screwfix Select


    By doc I assume you mean DPC if so yes.
     
  6. Kaned93

    Kaned93 Member

    yes dpc sorry finishing off a ch install spellchecker doesn't work rushed! really appreciate that
     
  7. Phil the Paver

    Phil the Paver Screwfix Select

    One question ive got is, "are you stepping the brickwork in from the existing house line".


    Only asking because the foundation isn't out far enough if its in line with the house.


    See red line on pic for reference (not to scale)

    2017-06-23 18.25.47.jpg
     
  8. Kaned93

    Kaned93 Member

    yeah it'll be 150 from the house line mate
     
    Phil the Paver likes this.