the unfinished floor in my extention is only 100mm lower than the existing level of the other rooms.there is no insultion under the concrete . would it be ok to put in 50mm of jab floor and then 50mm screed or just put in 100mm screed?
I would put 25mm insulation so you have a 75mm which is minimal you want and its also got to be fibre screed