I need to move a radiator approx 250mm along a wall but the existing pipework comes up through a concrete tiled floor. The only way i can think...
Been asked to provide multiple downlighters but no access from above. Any tips on an easy way to route cables past ceiling joists but still...
Recently I believe someone posted the numbers for these. Can you repost please. Thanks in advance. Dave
Can someone clarify as to when a metal part of a building becomes an extraneous metal part and therefore requires bonding. I have been asked to...
I have been asked to quote for a job in an outbuilding to be used as a small workshop. The customer requires 5 x strip lights and 5 x double...
house is 45 years old and the cold water pipe is a black alkethene pipe, i have a leak where the pipe goes into a fitting, a plumber told me he...
Can someone advise me on filling in line 1 page 3 of the NICEIC green form for the following scenario: 40a mcb from non rcd side of main CU...
Hi Doing my first TT provision in a garage that is separate from main house (PME). Have run 6mm twin SWA from 40a mcb on non rcd side of CU to...
Hi I'm new to this forum but could someone tell me if i can lay ceramic tiles on a floating floor. The floor is 22mm chipboard laid on 75mm...
I have wired 15 downlighters in a kitchen with 1.5mm T&E. This is just part of a full installation which I am using to register with the NICEIC...
The leccy board are coming out to move my meter but it is going to be some 10m from the existing CU. Whats the correct way to wire a/ new tails...