Electric shower has been removed and will not be reinstalled as far as I can see. Cables enter the back of the CU and access to it is impossible so pulling the cable out of the CU doesn’t work. I am proposing labelling the cable in the CU and connecting all three cores to the earth bar with suitable indicator tape. That avoids floating cables in the CU Which I don’t like is there a better way?