Hi, I would like to know the cost difference between easi joists vs timber joists with metal support at the end. I have a first floor area of 30ft X 45ft Also, ususally how long does it take to deliver the easi joists ? is it going to take 10 weeks? RK
They are made to measured, designed for your job, a lot of Easi joists firms will give a free quotation. There are many advantages using Easijoists/Posi-Joist over timber joists. http://www.huwsgray.co.uk/shop/building-materials/timber/easi-joist.html http://www.haldane-fisher.com/timber/engineered/posi-joists/ http://www.donaldsontimberengineering.co.uk/timber-engineering-open-web-joists.php https://www.wolfsystem.co.uk/find-a-manufacturer.aspx