Hi, Hopefully some can help, I have had a concrete base put in for a Dunster house log cabin. The base needs to level and flat. The guy used has left some ripples that’s made it not flat and not level. I was thinking of using a levelling compound or grinding some of the ripples back? open to suggestions and advice.
It's pretty normal to have ridges left from the levelling process, as they will usually be covered by a wooden floor or similar. If it is out of level, you could bed the frame onto a bed of mortar?