Preparing previous quarry sand subbase for tiling

Discussion in 'Tilers' Talk' started by Trial and Error, Apr 29, 2020.

  1. Trial and Error

    Trial and Error New Member

    0461407D-56B0-407B-9472-16D026B557AD.jpeg 50059386-86A4-4B9C-BDC3-358C8D907295.jpeg I would like to tile (with normal porcelain tiles) our hallway which currently has quarry tiles. The floor sinks slightly in the middle so we decided to investigate and lifted a few quarry tiles out. The subbase appears to be sand which is what I expected after reading a few websites on the internet.
    The area is about 1sqm so quite small and manageable for any work.
    What do I need to do to prepare the surface for tiling? The rest of the house is floorboard.
    Many thanks.
     

Share This Page