    hello

    I live in a 50’s block. I’m clearing kitchen floor to self-level it, it’s a concrete floor that has previously been covered with assorted vinyl tiles.
    Removing them i found very loose layer of concrete which i have thought best to pull up before self-levelling. Its about 40mm thick slab, about a metre squared. I put down directly bluecircle multipurpose readymixed concrete, which i realise now i didnt put down a bonding agent before. However, my question mainly is, how long do i let the concrete dry or cure before sealing (with SBR?) and before putting down self-levelling compound. I really dnt want to mess this up but time is really of the essence. What’s the minimum time i can wait before sealing the new concrete and covering with leveller? Cheers people!
     

Share This Page

  1. This site uses cookies to help personalise content, tailor your experience and to keep you logged in if you register.
    By continuing to use this site, you are consenting to our use of cookies.
    Dismiss Notice