Setting time - Mapei Pro Grip

Discussion in 'Tilers' Talk' started by BiancoTheGiraffe, Sep 17, 2022.

  1. BiancoTheGiraffe

    BiancoTheGiraffe Screwfix Select

    How long should I be expecting this stuff to take to set...

    Just had a tile pull clean off a primed plywood panel after 18 hours (1mm adhesive)
     
  2. JimTiler

    JimTiler Active Member

    The adhesive isn’t suitable for plywood.
     
  3. BiancoTheGiraffe

    BiancoTheGiraffe Screwfix Select

    Really? Even when primed?
     
  4. JimTiler

    JimTiler Active Member

    What size and material are the tiles?
     
  5. BiancoTheGiraffe

    BiancoTheGiraffe Screwfix Select

    Ceramic. 500x250x9

    Most of them are stuck fine as far as I can tell
     
  6. JimTiler

    JimTiler Active Member

    Yeah, tiles are too big for tubbed adhesive really, maximum is usually 300mm x 300mm.
    Tubbed adhesives dry by dispersion so I would leave it a week or so to allow the adhesive plenty of drying time before grouting, drilling into etc.
     
    BiancoTheGiraffe likes this.
  7. BiancoTheGiraffe

    BiancoTheGiraffe Screwfix Select

    I did wonder about air drying being a problem, but I'm a rubbish tiler so didn't want to use powder!

    I'll just leave it ages as you suggest... Got a dehumidifier running so hopefully that will help
     
    JimTiler likes this.
  8. JimTiler

    JimTiler Active Member

    A standard setting powdered adhesive will give you around 4-5 hours working time and you could always mix up half a bag at a time if it’s slow going/loads of cuts.
     
  9. BiancoTheGiraffe

    BiancoTheGiraffe Screwfix Select

    Wow, that's a lot longer than I expected!

    I was thinking more like half an hour working time, I'll definitely go with powdered in future.
     