    Hi all,

    I've recently built an extension and want to put a stud wall in to divide the kitchen area from the utility room. The floor slab is down but not the screed yet. Do I need to wait for the screed (between 60 and 75mm) or can I build the stud wall and screed up to it? I assume I can fix it to the concrete with screws to prevent it moving about (concrete floor is 100mm thick) 
     
  2. Mr. Handyandy

    Mr. Handyandy Screwfix Select

    Wall on top I'd say.

    Mr. HandyAndy - Really
     
  3. hallbeck

    hallbeck New Member

    If it is a bonded screed - the wall can go on top. If there is insulation under the screed then the wall must sit on the concrete.
     